Ready to tile!

The bathroom is all prepped and ready to go with tiling, which I'll be doing this week. Suddenly this whole bathroom renovation looks like it will be over soon. Once the tiling and grouting are done, I need to call the company that does the bath resurfacing, which will take half a day to be done. Then I can install the tapware and shower, new hand-basin and the glass shower screen  (Rick McLean Fix and Swing.........500 fixed and 400 swing). Shelf and mirror. Silicone sealing and painting and it will be done! Can't wait to have that first shower!


Cement sheeting underlay down.

                                        Bath surround tanked and waterproofed ready for tiling 
                                          (This was after one coat - another was added later)
 
                                   Where the door was........this will be shelving and storage.

This bathroom renovation has been a massive job - I'll probably take a month off after its done and then get back into painting (still a couple of rooms to do) and the outside jobs are always beckoning! 

2 comments:

  1. It will be fabulous. You will be able to relax in the tub maybe with a glass of bubbles! 😊

    ReplyDelete